- In the final stages of the new alternate truck route, (VT 100) with the pedestrian bridge in the background.
- Tying Reinforcing Steel on the Slant Bridge
- Early stages of the new Route VT100
- Moving Backhoe over the River
- Moving Backhoe to the other side of River
- Porkchop beam for the south slant leg
- Lowering the Porkchop beam
- Swinging girder into place to connect beam splice
- Temporary shoring towers for steel erection
- Steel erection phase completed
- Aligning to install bearing pins
- Alternate Truck Route with Pedestrian Bridge
- Alternate Truck Route VT100
- Installing drainage Structure
- Lamoille Valley Rail Trail allowing pedestrians to cross, Vermont's East-West Adventure Trails