In the final stages of the new alternate truck route, (VT 100) with the pedestrian bridge in the background.
Tying Reinforcing Steel on the Slant Bridge
Early stages of the new Route VT100
Moving Backhoe over the River
Moving Backhoe to the other side of River
Porkchop beam for the south slant leg
Lowering the Porkchop beam
Swinging girder into place to connect beam splice
Temporary shoring towers for steel erection
Steel erection phase completed
Aligning to install bearing pins
Alternate Truck Route with Pedestrian Bridge
Alternate Truck Route VT100
Installing drainage Structure
Lamoille Valley Rail Trail allowing pedestrians to cross, Vermont's East-West Adventure Trails