• In the final stages of the new alternate truck route, (VT 100) with the pedestrian bridge in the background.
  • Tying Reinforcing Steel on the Slant Bridge
  • Early stages of the new Route VT100
  • Moving Backhoe over the River
  • Moving Backhoe to the other side of River
  • Porkchop beam for the south slant leg
  • Lowering the Porkchop beam
  • Swinging girder into place to connect beam splice
  • Temporary shoring towers for steel erection
  • Steel erection phase completed
  • Aligning to install bearing pins
  • Alternate Truck Route with Pedestrian Bridge
  • Alternate Truck Route VT100
  • Installing drainage Structure
  • Lamoille Valley Rail Trail allowing pedestrians to cross, Vermont's East-West Adventure Trails